Salt Lake County Find It
xx banner image

Public Works Engineering—Flood Control

Flood Control Permits

Ordinance, Forms, Instructions,
Standards & Guidelines

Title 17 of the Salt Lake County Code of Ordinances defines the Flood Control Permit Program. Flood Control Permits are intended to serve the purposes of; installation of structures or bridges, storm water discharges, utility line crossings, bank stabilization, or any other activity which occurs within twenty feet (6.1 meters) of the top of the channel bank of any countywide flood control facility.

This page will allow you to download Title 17, the permit application form, our guidance & standards documents. Simply pick the link and save the web page or document to your hard drive for later viewing. Some documents require the free Adobe Acrobat viewer Exit Site or AutoCAD Whip! Exit Siteviewers.

For further assistance, please call our Permit Specialist at (385) 468-6600 or Email us.