Text Size A  A  A
Header Image 1 Header Image 4

Public Works, Flood Control Engineering

PW Engineering Home

Flood Control Manual

Window and Door Protection



 

PREVENT debris from entering doorways and windows by use of Baffle Boards.

HAZARD may require complete closure of a door and necessitate the use of another entrance.

MATERIALS can be dismantled after the storm season and stored year to year.

USE low grade plywood, and overlap windows, vents or doors three to four inches on all sides.

SECURE the plywood with four or more nails, screws or bolts; a stake and board may also be used to wedge boards in place.USE low grade lumber and overlap section with protruding face downstream.

 

Back Next

This site     All SLCo

Divider Image 1 Divider Image 2

Salt Lake County Government Center – 2001 South State Street Salt Lake City, UT 84190 – 801 468-3000

SLCo Home | Mayor | Council | Government | Business | SLCo Web Sites | FAQ | SLCo Directory | Site Index | Search

webadmin@slco.org | Disclaimer | Copyright © 2004 Salt Lake County - All Rights Reserved | Privacy Statement | GRAMA Information

 
Link to SLCo home Link to SLCo home Link to SLCo home